-
Recent Posts
Recent Comments
Archives
Categories
Meta
Category Archives: ArchiTests
CPTED / Defensible Space
http://en.wikipedia.org/wiki/Crime_prevention_through_environmental_design http://www.cptedsecurity.com/cpted_design_guidelines.htm http://www.cpted.net/default.html VOCAB: Natural Surveillance Natural Access Control Territorial Reinforcement Maintenance
Posted in ArchiTests
Comments Off on CPTED / Defensible Space
Competitions
A couple of websites listing architecture competitions: Death by Architecture Bustler Archinect ArchDaily TheArchitectureRoom
Posted in ArchiDork, ArchiTests
Comments Off on Competitions
Licensure Comparative
The rabble rabble of discontent with the current examination, internship and fee structure has instigated a call for change in the now long and convoluted path to licensure.
Posted in ArchiTests
Comments Off on Licensure Comparative
Associate Director Report 11/5/13
AIAIC ASSOCIATE DIRECTOR REPORT: November 5, 2013 1. Site Planning and Design Exam ‐ 3 exams scheduled before the end of the year ‐ Sessions will complete this month 2. Design competitions ‐ AIASFV IDP Competition [November 11th / $75 … Continue reading
Posted in ArchiTests
Comments Off on Associate Director Report 11/5/13
Sustainable Design
LEED CREDIT CATEGORIES: -Sustainable Sites -Water Efficiency -Energy and Atmosphere -Material and Resources -Indoor Environmental Quality (-Innovation and Design) VOCAB: EMBODIED ENERGY VOC SICK BUILDING SYNDROME LIFE CYCLE COST CFC ALBEDO SRI POTABLE WATER GREY WATER BLACK WATER FLYASH HEAT … Continue reading
Posted in ArchiTests
Comments Off on Sustainable Design
Codes, Standards, Acts, etc.
IBC – Model Code for construction & design – Other similar model codes UBC (seismic), BOCA (snow), SBC (wind) – Occupancy Types – Construction Types – Means of Egress NFPA – Model Code to minimize possibility & effects of fire … Continue reading
Posted in ArchiTests
Comments Off on Codes, Standards, Acts, etc.
Delivery Methods
AIA Delivery Method Brief AREFORUM Government Project Delivery Methods: DBB – Design Bid Build – Owner has a separate contract with Architect (designer/agent) and Contractor (builder) – Traditional Bidding Method – Promotes most competitive bidding climate – Creates adversarial relationship … Continue reading
Posted in ArchiTests
Comments Off on Delivery Methods
NCARB My Examination Page
Looks like NCARB actually finished as promised and the blackout is over. No reason to not schedule your exams now. There is a fact sheet outlining how the blackout will affect your rolling clock and the exam taking procedure. And … Continue reading
Posted in ArchiTests
Comments Off on NCARB My Examination Page
Contracts (cont’d)
A201 General Conditions 1 GENERAL PROVISIONS – Instruments of service: studies, models, sketches, drawings, specs, etc. – Contractor and subs can reproduce instruments of service solely for project 2 OWNER – Contractor can request evidence of owners financial ability to … Continue reading
Posted in ArchiTests
Comments Off on Contracts (cont’d)
Design in a nutshell
These short videos are a great little intro to various design movements and their architects. Hopefully they will help provide visuals to associate with some of the major aspects of architectural history.
Posted in ArchiDork, ArchiTests
Comments Off on Design in a nutshell